Quality starts with understanding the field condition before material is installed.
Condition Review
Rated assembly, penetrant, geometry, insulation, movement and access should be considered before the work begins.
Installation Discipline
Work areas should be prepared, materials installed for the intended condition and completed areas protected from damage by follow-on construction.
Closeout
Photos, location records, punch-list tracking and project-specific documentation should be collected in a way that the project team can actually use.
